name: sprint-plan
|
||||
description: "Generates a new sprint plan or updates an existing one based on the current milestone, completed work, and available capacity. Pulls context from production documents and design backlogs."
|
||||
argument-hint: "[new|update|status] [--review full|lean|solo]"
|
||||
user-invocable: true
|
||||
allowed-tools: Read, Glob, Grep, Write, Edit, Task, AskUserQuestion
|
||||
model: sonnet
|
||||
context: |
|
||||
!ls production/sprints/ 2>/dev/null
|
||||
---
|
||||
|
||||
## Phase 0: Parse Arguments
|
||||
|
||||
Extract the mode argument (`new`, `update`, or `status`) and resolve the review mode (once, store for all gate spawns this run):
|
||||
1. If `--review [full|lean|solo]` was passed → use that
|
||||
2. Else read `production/review-mode.txt` → use that value
|
||||
3. Else → default to `lean`
|
||||
|
||||
See `.claude/docs/director-gates.md` for the full check pattern.
|
||||
|
||||
**Review mode check** (before gates run):
|
||||
- Read `production/review-mode.txt` if it exists. Use that mode.
|
||||
- If the file doesn't exist and this is a `new` sprint: use `AskUserQuestion`:
|
||||
- Prompt: "No review mode is set. Which review depth would you like for this sprint?"
|
||||
- Options:
|
||||
- `[A] full — spawn all director and lead gates`
|
||||
- `[B] lean — skip non-phase-gate director reviews (recommended for most sprints)`
|
||||
- `[C] solo — skip all gate spawning`
|
||||
- After selection: write `production/review-mode.txt` with the chosen mode. Say: "Review mode set to [mode] and saved to production/review-mode.txt."
|
||||
- If the file doesn't exist and this is NOT a `new` sprint (e.g., updating an existing sprint): default to `lean` silently.
|
||||
|
||||
---
|
||||
|
||||
## Phase 1: Gather Context
|
||||
|
||||
1. **Read the current milestone** from `production/milestones/`.
|
||||
|
||||
2. **Read the previous sprint** (if any) from `production/sprints/` to
|
||||
understand velocity and carryover.
|
||||
|
||||
3. **Scan design documents** in `design/gdd/` for features tagged as ready
|
||||
for implementation.
|
||||
|
||||
4. **Check the risk register** at `production/risk-register/`.
|
||||
|
||||
---
|
||||
|
||||
## Phase 2: Generate Output
|
||||
|
||||
For `new`:
|
||||
|
||||
**Generate a sprint plan** following this format and present it to the user. Do NOT ask to write yet — the producer feasibility gate (Phase 4) runs first and may require revisions before the file is written.
|
||||
|
||||
```markdown
|
||||
# Sprint [N] — [Start Date] to [End Date]
|
||||
|
||||
## Sprint Goal
|
||||
[One sentence describing what this sprint achieves toward the milestone]
|
||||
|
||||
## Capacity
|
||||
- Total days: [X]
|
||||
- Buffer (20%): [Y days reserved for unplanned work]
|
||||
- Available: [Z days]
|
||||
|
||||
## Tasks
|
||||
|
||||
### Must Have (Critical Path)
|
||||
| ID | Task | Agent/Owner | Est. Days | Dependencies | Acceptance Criteria |
|
||||
|----|------|-------------|-----------|-------------|-------------------|
|
||||
|
||||
### Should Have
|
||||
| ID | Task | Agent/Owner | Est. Days | Dependencies | Acceptance Criteria |
|
||||
|----|------|-------------|-----------|-------------|-------------------|
|
||||
|
||||
### Nice to Have
|
||||
| ID | Task | Agent/Owner | Est. Days | Dependencies | Acceptance Criteria |
|
||||
|----|------|-------------|-----------|-------------|-------------------|
|
||||
|
||||
## Carryover from Previous Sprint
|
||||
| Task | Reason | New Estimate |
|
||||
|------|--------|-------------|
|
||||
|
||||
## Risks
|
||||
| Risk | Probability | Impact | Mitigation |
|
||||
|------|------------|--------|------------|
|
||||
|
||||
## Dependencies on External Factors
|
||||
- [List any external dependencies]
|
||||
|
||||
## Definition of Done for this Sprint
|
||||
- [ ] All Must Have tasks completed
|
||||
- [ ] All tasks pass acceptance criteria
|
||||
- [ ] QA plan exists (`production/qa/qa-plan-sprint-[N].md`)
|
||||
- [ ] All Logic/Integration stories have passing unit/integration tests
|
||||
- [ ] Smoke check passed (`/smoke-check sprint`)
|
||||
- [ ] QA sign-off report: APPROVED or APPROVED WITH CONDITIONS (`/team-qa sprint`)
|
||||
- [ ] No S1 or S2 bugs in delivered features
|
||||
- [ ] Design documents updated for any deviations
|
||||
- [ ] Code reviewed and merged
|
||||
```
|
||||
|
||||
For `update`:
|
||||
|
||||
**Update an existing sprint plan**:
|
||||
|
||||
1. Read the most recent sprint plan from `production/sprints/`.
|
||||
2. Present the current story list with their current statuses from `production/sprint-status.yaml`.
|
||||
3. Ask the user what to change: stories to add, remove, reprioritize, or re-estimate. Use `AskUserQuestion` to gather changes.
|
||||
4. Apply the changes and re-present the full revised plan for review.
|
||||
5. Re-run the producer feasibility gate (Phase 4) on the revised plan.
|
||||
6. Write the updated markdown plan and yaml together (same approval as `new` mode).
|
||||
|
||||
Note: `update` mode does not reset story statuses. Stories already marked `in-progress` or `done` keep their status. Only `backlog` and `ready-for-dev` stories can be removed or reprioritized freely.
|
||||
|
||||
For `status`:
|
||||
|
||||
**Generate a status report**:
|
||||
|
||||
```markdown
|
||||
# Sprint [N] Status -- [Date]
|
||||
|
||||
## Progress: [X/Y tasks complete] ([Z%])
|
||||
|
||||
### Completed
|
||||
| Task | Completed By | Notes |
|
||||
|------|-------------|-------|
|
||||
|
||||
### In Progress
|
||||
| Task | Owner | % Done | Blockers |
|
||||
|------|-------|--------|----------|
|
||||
|
||||
### Not Started
|
||||
| Task | Owner | At Risk? | Notes |
|
||||
|------|-------|----------|-------|
|
||||
|
||||
### Blocked
|
||||
| Task | Blocker | Owner of Blocker | ETA |
|
||||
|------|---------|-----------------|-----|
|
||||
|
||||
## Burndown Assessment
|
||||
[On track / Behind / Ahead]
|
||||
[If behind: What is being cut or deferred]
|
||||
|
||||
## Emerging Risks
|
||||
- [Any new risks identified this sprint]
|
||||
```
|
||||
|
||||
---
|
||||
|
||||
## Phase 3: Prepare Sprint Status File
|
||||
|
||||
After generating a new sprint plan, also prepare the `production/sprint-status.yaml` content.
|
||||
This is the machine-readable source of truth for story status — read by
|
||||
`/sprint-status`, `/story-done`, and `/help` without markdown parsing.
|
||||
|
||||
**Do not write the yaml yet** — hold it in context. The producer feasibility gate (Phase 4) may revise the story list. Both files will be written together after Phase 4 in a single write approval.
|
||||
|
||||
Format:
|
||||
|
||||
```yaml
|
||||
# Auto-generated by /sprint-plan. Updated by /story-done and /dev-story.
|
||||
# DO NOT edit manually — use /story-done to update story status.
|
||||
#
|
||||
# Status value mapping (yaml ↔ story file Status field):
|
||||
# backlog ↔ Not Started
|
||||
# ready-for-dev ↔ Ready
|
||||
# in-progress ↔ In Progress
|
||||
# review ↔ In Review
|
||||
# done ↔ Complete
|
||||
# blocked ↔ Blocked
|
||||
|
||||
sprint: [N]
|
||||
goal: "[sprint goal]"
|
||||
start: "[YYYY-MM-DD]"
|
||||
end: "[YYYY-MM-DD]"
|
||||
generated: "[YYYY-MM-DD]"
|
||||
updated: "[YYYY-MM-DD]"
|
||||
|
||||
stories:
|
||||
- id: "[epic-story, e.g. 1-1]"
|
||||
name: "[story name]"
|
||||
file: "[production/stories/path.md]"
|
||||
priority: must-have # must-have | should-have | nice-to-have
|
||||
status: ready-for-dev # backlog | ready-for-dev | in-progress | review | done | blocked
|
||||
owner: ""
|
||||
estimate_days: 0
|
||||
blocker: ""
|
||||
completed: ""
|
||||
```
|
||||
|
||||
Initialize each story from the sprint plan's task tables:
|
||||
- Must Have tasks → `priority: must-have`, `status: ready-for-dev`
|
||||
- Should Have tasks → `priority: should-have`, `status: backlog`
|
||||
- Nice to Have tasks → `priority: nice-to-have`, `status: backlog`
|
||||
|
||||
For `update`: read the existing `sprint-status.yaml`, carry over statuses for
|
||||
stories that haven't changed, add new stories, remove dropped ones.
|
||||
|
||||
---
|
||||
|
||||
## Phase 4: Producer Feasibility Gate
|
||||
|
||||
**Review mode check** — apply before spawning PR-SPRINT:
|
||||
- `solo` → skip. Note: "PR-SPRINT skipped — Solo mode." Proceed to Phase 5 (QA plan gate).
|
||||
- `lean` → skip (not a PHASE-GATE). Note: "PR-SPRINT skipped — Lean mode." Proceed to Phase 5 (QA plan gate).
|
||||
- `full` → spawn as normal.
|
||||
|
||||
Before finalising the sprint plan, spawn `producer` via Task using gate **PR-SPRINT** (`.claude/docs/director-gates.md`).
|
||||
|
||||
Pass: proposed story list (titles, estimates, dependencies), total team capacity in hours/days, any carryover from the previous sprint, milestone constraints and deadline.
|
||||
|
||||
Present the producer's assessment.
|
||||
|
||||
If UNREALISTIC: revise the story selection (defer stories to Should Have or Nice to Have) and re-present the updated plan before asking for write approval.
|
||||
|
||||
If CONCERNS, use `AskUserQuestion`:
|
||||
- Prompt: "Producer flagged concerns with this sprint plan. How do you want to proceed?"
|
||||
- Options:
|
||||
- `[A] Proceed as planned — I accept the risk`
|
||||
- `[B] Adjust scope — defer some Should Have stories`
|
||||
- `[C] Extend the sprint timeline`
|
||||
|
||||
If [A]: proceed to write approval.
|
||||
If [B]: revise the story list, re-present the updated plan, then proceed to write approval.
|
||||
If [C]: adjust sprint dates and capacity, re-present the updated plan, then proceed to write approval.
|
||||
|
||||
After handling the producer's verdict, ask: "May I write the sprint plan to `production/sprints/sprint-[N].md` and `production/sprint-status.yaml`?" If yes, write both files (creating directories as needed). Verdict: **COMPLETE** — sprint plan and status file created. If no: Verdict: **BLOCKED** — user declined write.
|
||||
|
||||
After writing, add:
|
||||
|
||||
> **Scope check:** If this sprint includes stories added beyond the original epic scope, run `/scope-check [epic]` to detect scope creep before implementation begins.
|
||||
|
||||
---
|
||||
|
||||
## Phase 5: QA Plan Gate
|
||||
|
||||
Before closing the sprint plan, check whether a QA plan exists for this sprint.
|
||||
|
||||
Use `Glob` to look for `production/qa/qa-plan-sprint-[N].md` or any file in `production/qa/` referencing this sprint number.
|
||||
|
||||
**If a QA plan is found**: note it in the sprint plan output — "QA Plan: `[path]`" — and proceed.
|
||||
|
||||
**If no QA plan exists**: do not silently proceed. Surface this explicitly:
|
||||
|
||||
> "This sprint has no QA plan. A sprint plan without a QA plan means test requirements are undefined — developers won't know what 'done' looks like from a QA perspective, and the sprint cannot pass the Production → Polish gate without one.
|
||||
>
|
||||
> Run `/qa-plan sprint` now, before starting any implementation. It takes one session and produces the test case requirements each story needs."
|
||||
|
||||
Use `AskUserQuestion`:
|
||||
- Prompt: "No QA plan found for this sprint. How do you want to proceed?"
|
||||
- Options:
|
||||
- `[A] Run /qa-plan sprint now — I'll do that before starting implementation (Recommended)`
|
||||
- `[B] Skip for now — I understand QA sign-off will be blocked at the Production → Polish gate`
|
||||
|
||||
If [A]: close with "Sprint plan written. Run `/qa-plan sprint` next — then begin implementation."
|
||||
If [B]: add a warning block to the sprint plan document:
|
||||
|
||||
```markdown
|
||||
> ⚠️ **No QA Plan**: This sprint was started without a QA plan. Run `/qa-plan sprint`
|
||||
> before the last story is implemented. The Production → Polish gate requires a QA
|
||||
> sign-off report, which requires a QA plan.
|
||||
```
|
||||
|
||||
---
|
||||
|
||||
## Phase 6: Next Steps
|
||||
|
||||
After the sprint plan is written and QA plan status is resolved:
|
||||
|
||||
- `/qa-plan sprint` — **required before implementation begins** — defines test cases per story so developers implement against QA specs, not a blank slate
|
||||
- `/story-readiness [story-file]` — validate a story is ready before starting it
|
||||
- `/dev-story [story-file]` — begin implementing the first story
|
||||
- `/sprint-status` — check progress mid-sprint
|
||||
- `/scope-check [epic]` — verify no scope creep before implementation begins
|
||||
|
||||
**Review mode configuration:** All director gates (producer feasibility, QA review, code review) respect the project review mode. The review mode is set in Phase 0 when the file does not exist (for `new` sprints), or can be overridden per-run with `--review full|lean|solo` as an argument. The file `production/review-mode.txt` contains one of:
|
||||
- `lean` — skip automated director gates (default if file is absent — fastest for solo dev)
|
||||
- `full` — run all director gates as spawned sub-agents
|
||||
- `solo` — skip all gates unconditionally (single-developer, no review)
|
||||
|
||||
This file is read by `/sprint-plan`, `/story-readiness`, `/story-done`, and other skills at startup.
|
||||
Reference in New Issue