name: estimate
|
||||
description: "Estimates task effort by analyzing complexity, dependencies, historical velocity, and risk factors. Produces a structured estimate with confidence levels."
|
||||
argument-hint: "[task-description]"
|
||||
user-invocable: true
|
||||
allowed-tools: Read, Glob, Grep
|
||||
model: sonnet
|
||||
---
|
||||
|
||||
## Phase 1: Understand the Task
|
||||
|
||||
Read the task description from the argument. If the description is too vague to estimate meaningfully, ask for clarification before proceeding.
|
||||
|
||||
Read CLAUDE.md for project context: tech stack, coding standards, architectural patterns, and any estimation guidelines.
|
||||
|
||||
Read relevant design documents from `design/gdd/` if the task relates to a documented feature or system.
|
||||
|
||||
---
|
||||
|
||||
## Phase 2: Scan Affected Code
|
||||
|
||||
Identify files and modules that would need to change:
|
||||
|
||||
- Assess complexity (size, dependency count, cyclomatic complexity)
|
||||
- Identify integration points with other systems
|
||||
- Check for existing test coverage in the affected areas
|
||||
- Read past sprint data from `production/sprints/` for similar completed tasks and historical velocity
|
||||
|
||||
---
|
||||
|
||||
## Phase 3: Analyze Complexity Factors
|
||||
|
||||
**Code Complexity:**
|
||||
- Lines of code in affected files
|
||||
- Number of dependencies and coupling level
|
||||
- Whether this touches core/engine code vs leaf/feature code
|
||||
- Whether existing patterns can be followed or new patterns are needed
|
||||
|
||||
**Scope:**
|
||||
- Number of systems touched
|
||||
- New code vs modification of existing code
|
||||
- Amount of new test coverage required
|
||||
- Data migration or configuration changes needed
|
||||
|
||||
**Risk:**
|
||||
- New technology or unfamiliar libraries
|
||||
- Unclear or ambiguous requirements
|
||||
- Dependencies on unfinished work
|
||||
- Cross-system integration complexity
|
||||
- Performance sensitivity
|
||||
|
||||
---
|
||||
|
||||
## Phase 4: Generate the Estimate
|
||||
|
||||
```markdown
|
||||
## Task Estimate: [Task Name]
|
||||
Generated: [Date]
|
||||
|
||||
### Task Description
|
||||
[Restate the task clearly in 1-2 sentences]
|
||||
|
||||
### Complexity Assessment
|
||||
|
||||
| Factor | Assessment | Notes |
|
||||
|--------|-----------|-------|
|
||||
| Systems affected | [List] | [Core, gameplay, UI, etc.] |
|
||||
| Files likely modified | [Count] | [Key files listed below] |
|
||||
| New code vs modification | [Ratio] | |
|
||||
| Integration points | [Count] | [Which systems interact] |
|
||||
| Test coverage needed | [Low / Medium / High] | |
|
||||
| Existing patterns available | [Yes / Partial / No] | |
|
||||
|
||||
**Key files likely affected:**
|
||||
- `[path/to/file1]` -- [what changes here]
|
||||
|
||||
### Effort Estimate
|
||||
|
||||
| Scenario | Days | Assumption |
|
||||
|----------|------|------------|
|
||||
| Optimistic | [X] | Everything goes right, no surprises |
|
||||
| Expected | [Y] | Normal pace, minor issues, one round of review |
|
||||
| Pessimistic | [Z] | Significant unknowns surface, blocked for a day |
|
||||
|
||||
**Recommended budget: [Y days]**
|
||||
|
||||
### Confidence: [High / Medium / Low]
|
||||
|
||||
[Explain which factors drive the confidence level for this specific task.]
|
||||
|
||||
### Risk Factors
|
||||
|
||||
| Risk | Likelihood | Impact | Mitigation |
|
||||
|------|-----------|--------|------------|
|
||||
|
||||
### Dependencies
|
||||
|
||||
| Dependency | Status | Impact if Delayed |
|
||||
|-----------|--------|-------------------|
|
||||
|
||||
### Suggested Breakdown
|
||||
|
||||
| # | Sub-task | Estimate | Notes |
|
||||
|---|----------|----------|-------|
|
||||
| 1 | [Research / spike] | [X days] | |
|
||||
| 2 | [Core implementation] | [X days] | |
|
||||
| 3 | [Testing and validation] | [X days] | |
|
||||
| | **Total** | **[Y days]** | |
|
||||
|
||||
### Notes and Assumptions
|
||||
- [Key assumption that affects the estimate]
|
||||
- [Any caveats about scope boundaries]
|
||||
```
|
||||
|
||||
Output the estimate with a brief summary: recommended budget, confidence level, and the single biggest risk factor.
|
||||
|
||||
This skill is read-only — no files are written. Verdict: **COMPLETE** — estimate generated.
|
||||
|
||||
---
|
||||
|
||||
## Phase 5: Next Steps
|
||||
|
||||
- If confidence is Low: recommend a time-boxed spike (`/prototype`) before committing.
|
||||
- If the task is > 10 days: recommend breaking it into smaller stories via `/create-stories`.
|
||||
- To schedule the task: run `/sprint-plan update` to add it to the next sprint.
|
||||
|
||||
### Guidelines
|
||||
|
||||
- Always give a range (optimistic / expected / pessimistic), never a single number
|
||||
- The recommended budget should be the expected estimate, not the optimistic one
|
||||
- Round to half-day increments — estimating in hours implies false precision for tasks longer than a day
|
||||
- Do not pad estimates silently — call out risk explicitly so the team can decide
|
||||