# Risk: [Short Title]
|
||||
|
||||
## Identification
|
||||
|
||||
- **ID**: RISK-[NNNN]
|
||||
- **Identified By**: [Agent or person]
|
||||
- **Date Identified**: [Date]
|
||||
- **Category**: [Technical | Design | Schedule | Resource | External | Quality]
|
||||
|
||||
## Assessment
|
||||
|
||||
- **Probability**: [Very Low | Low | Medium | High | Very High]
|
||||
- **Impact**: [Minimal | Minor | Moderate | Major | Critical]
|
||||
- **Risk Score**: [Probability x Impact = Low / Medium / High / Critical]
|
||||
|
||||
## Description
|
||||
|
||||
[Detailed description of the risk. What could go wrong? Under what conditions?]
|
||||
|
||||
## Trigger Conditions
|
||||
|
||||
[What observable conditions would indicate this risk is materializing?]
|
||||
|
||||
- [Condition 1]
|
||||
- [Condition 2]
|
||||
|
||||
## Impact Analysis
|
||||
|
||||
### If This Risk Materializes
|
||||
|
||||
- **Schedule Impact**: [How many days/weeks of delay]
|
||||
- **Quality Impact**: [What quality degradation]
|
||||
- **Scope Impact**: [What features affected]
|
||||
- **Cost Impact**: [Resource cost of dealing with it]
|
||||
|
||||
### Affected Systems/Features
|
||||
|
||||
- [System 1]
|
||||
- [System 2]
|
||||
|
||||
## Mitigation Strategy
|
||||
|
||||
### Prevention (reduce probability)
|
||||
|
||||
- [Action to prevent this risk from occurring]
|
||||
- [Owner and deadline for prevention action]
|
||||
|
||||
### Contingency (reduce impact if it occurs)
|
||||
|
||||
- [Action to take if this risk materializes]
|
||||
- [Owner responsible for contingency execution]
|
||||
|
||||
## Current Status
|
||||
|
||||
- **Status**: [Open | Mitigating | Occurred | Closed]
|
||||
- **Last Reviewed**: [Date]
|
||||
- **Trend**: [Increasing | Stable | Decreasing]
|
||||
- **Notes**: [Any updates]
|
||||